938290285
This email address is being protected from spambots. You need JavaScript enabled to view it.
Home
The company
About Aplitelc
Integrated management system
Quality policy and CSR
Catalogues
Subscripció al butlletí
Services
Engineering
Renewable energies
Automation and programming
Industrial installations
Maintenance
Projects
Hydroelectric power plants
Spain
Panama
Guatemala
Wind turbines
Industrial installations
Cooperation projects
Blog
Contact us
CH Sau
Central Hidroelèctrica de Sau a Vilanova de Sau, Girona. Central hidroelèctrica de 66 MVA.
Sistema d'extinció amb CO2
Sala de control
Additional Info
Customer:
Endesa Generación
Date:
2011
Project type:
Central reformada
River:
Ter
Town:
Vilanova de Sau
Province:
Girona
Autonomous comunity:
Catalunya
Country:
Espanya
Power plant type:
Embassament
Turbine:
Francis (2 grups)
Turbine flow:
70 m3/s
Generating voltage:
10.500 V
Installed capacity:
66 MVA
Grid voltage:
110.000 V
Mapa de situació:
Tweet
Published in
Catalonia
Tagged under
hp
spain
catalonia
endesa
ter
francis
reformed
reservoir
Related items
CH La Cuchilla (Panamà)
CH Las Fuentes II (Guatemala)
CH Las Cruces (Panamà)
CH Can Caballé
CH Guixaró
More in this category:
« CH Sant Maurici
CH Pasteral I »
back to top
FaLang translation system by Faboba
Home
The company
About Aplitelc
Integrated management system
Quality policy and CSR
Catalogues
Subscripció al butlletí
Services
Engineering
Renewable energies
Automation and programming
Industrial installations
Maintenance
Projects
Hydroelectric power plants
Spain
Panama
Guatemala
Wind turbines
Industrial installations
Cooperation projects
Blog
Contact us