• 938290285
  • This email address is being protected from spambots. You need JavaScript enabled to view it.

CH Deva

Central Hidroelèctrica de Deva a Qunintela de Leirado, Galícia. Central hidroelèctrica de 5 MW

  • san11
  • san15
  • DSCF0032

Additional Info

  • Customer: Hidroeléctrica San miguel
  • Date: 1999
  • Project type: Nova construcció
  • River: Deva
  • Town: Quintela de Leirado
  • Province: Ourense
  • Autonomous comunity: Galícia
  • Country: Espanya
  • Power plant type: Embassament
  • Turbine: Pelton (2 injectors)
  • Generating voltage: 6.000 V
  • Installed capacity: 5.000 kW
  • Grid voltage: 20.000 V
  • Mapa de situació:
More in this category: « CH Castro Caldelas CH Fragoso »

Joomla! Debug Console

Session

Profile Information

Memory Usage

Database Queries